Project of designing regulated by norms and rules, state standard “System of project documentation for building” construction design and estimate documentation and can be divided on three interconnected stages:
1) Preproject works, engineering exploration, which is performed by:
-
Exploration of the ground for planned building
-
Preparation of performance specification on the execution of preproject (project) works.
-
Estimation of preliminary budget for planned building
-
Development and harmonization declaration of expectancies
-
Permitting from the administration of the region on the placing of the object
-
Receipt of technical requirements and specifications form the state regulatory agencies and interested organizations
-
Receipt of source data on the technical equipment
-
Investment justification
-
Receipt of architectural plan
2) Technological designing:
-
Sawing
-
Slabby (MDF, OSB, LVL, veneer, wood particle board and so on)
-
Repeated reprocessing bolt timber (glued beam, moulded strips and others)
-
Furniture
-
Wooden constructions (windows, doors and others)
-
Wooden building constructions (wireframe, bar)
-
Recycling of woodworking and other woodworking productions
3) Detail planning, which is performed by the following parts:
-
Architectural part
-
Power supply, electrical equipment, electrical lightning
-
Water supply, sewage
-
Heating, ventilation
-
General plan and transport
-
Conditioning
-
Estimate documents
-
Scheduling, communication and alarm system
-
Mechanization of technological processes
-
Pneumatic transport and aspiration
-
Environmental protection
-
Organization of construction project
-
Heat supply
-
Automation and control equipment
-
Investment efficiency, techno-economic part
-
Heat-mechanic part
Amount of workable documentation can be decreased optional by customer. It will be fixed in the project statement.
|